OUR EXPERTISE
Transportation & Installation – Operation. Hover over a card, or tap it, to see the details.
01 STRUCTURE INSTALLATION HOVER FOR DETAILS →
STRUCTURE INSTALLATION
Jacket Lifting Installation
Jacket Launching
Topside Installation
Module/Module Support Frame (MSF)
Helideck Installation
Flare Boom Installation
Bridge Installation
Jacket and Topside Loadout
02 RIGID PIPELINE INSTALLATION HOVER FOR DETAILS →
RIGID PIPELINE INSTALLATION
Shore Approach/Beach Pull
Rigid Pipelay
Pipeline Sidewalk
Mid-Point Tie-in
Pipeline Loadout
03 PIPELINE PRE-COMMISSIONING HOVER FOR DETAILS →
PIPELINE PRE-COMMISSIONING
Flooding Gauging and Cleaning (FCG)
Baseline Survey
Hydrotest
Dewatering and Drying
Nitrogen Packing
04 SUBSEA STRUCTURAL INSTALLATION HOVER FOR DETAILS →
SUBSEA STRUCTURAL INSTALLATION
Stalk-on Risers to pipeline using davits to lift pipeline
Retrofit Risers & I/J Tube Installation
J-tube / I-tube Installation
Subsea Spools Installation
Concrete Mattresses/Concrete Sleepers/Buckle Triggers Installation
Subsea structures: Pipeline End Termination (PLET), Pipeline End Manifold (PLEM), Subsea Valve Skids (SSVS) and Mid Water Arch Installation
Installation of Riser Guards, Boat Landings, Barge Bumpers
Pipeline Crossing and Freespan Rectification
Redundant Riser and Riser Clamp Removal Works
Riser and I/J-tube Installation
Riser Clamp/Riser Guard Clamp Installations
Subsea Structure Loadout
05 FSO/FPSO/MOPU INSTALLATION/RELOCATION & DECOMMISSIONING HOVER FOR DETAILS →
FSO/FPSO/MOPU INSTALLATION/RELOCATION & DECOMMISSIONING
Mooring Chain with Anchor Pile/Anchors Installation
Mooring Chain Pre-Tensioning
Mooring Chain Pull In/Hook Up
Final Mooring Chain Tensioning
FPSO/FSO Towing
Export Hose Installation
Mooring Chain Loadout
MOPU Towing
MOPU Jacking
MOPU Watertight Integrity Test
06 SUBSEA UMBILICAL, RISER, FLOWLINE (SURF) INSTALLATION HOVER FOR DETAILS →
SUBSEA UMBILICAL, RISER, FLOWLINE (SURF) INSTALLATION
Subsea umbilicals, risers, flowlines and cables Installation
Composite cables/Fibre Optic Cables (FOC) Installation
Flying Lead/Jumper installation
Cable Transpooling and Loadout
Flowline/Umbilical/FOC reels Loadout
07 MARINE OPERATIONS HOVER FOR DETAILS →
MARINE OPERATIONS
Towing Procedure
Anchor Handling Procedure
Emergency Pull-Out Procedure
Gangway Installation Procedure
08 BIDDING SUPPORT HOVER FOR DETAILS →
BIDDING SUPPORT
Method statement
Project Execution Plan (PEP)
Request for Quotation (RFQ)